LabWare Centralized Visibility Into Global Instructor Scheduling with Workato Integrations

LabWare Centralized Visibility Into Global Instructor Scheduling with Workato Integrations

The Client Profile: LabWare

  • Industry: Laboratory Informatics / Enterprise Software
  • Use Case: ILT Resource & Instructor Scheduling Integration
  • Headquarters: Wilmington, Delaware
  • Global Reach: 40+ offices across six continents and customers in 125 countries

LabWare is a global provider of laboratory informatics software specializing in Laboratory Information Management Systems (LIMS), Electronic Laboratory Notebooks (ELN), and laboratory automation. Headquartered in Wilmington, Delaware, LabWare operates more than 40 offices across six continents and supports customers in 125 countries.

With a geographically distributed organization, LabWare needed its learning technology to support instructor-led training programs across locations while giving program administrators the visibility required to effectively manage training resources but there was a problem; the information administrators needed to coordinate instructors existed across different systems, and Docebo did not natively provide the resource-allocation visibility required to bring it together.

The Challenge

Managing Instructor Resources Across Disconnected Learning and Scheduling Systems

Instructor-led training (ILT) depends on more than course creation and learner enrollment, organizations also need an accurate way to understand instructor availability, coordinate resources, identify scheduling conflicts, and plan future training sessions. When that information is distributed across multiple platforms, even routine scheduling can become a time-consuming administrative process.

For LabWare, the information required to manage instructor-led training existed across two critical systems: Docebo and Microsoft 365.

Docebo served as the learning management system (LMS), managing courses, ILT sessions, and training-related information. Microsoft 365 contained the broader calendars and scheduling commitments that determined whether instructors were actually available. Each platform provided an important part of the scheduling picture, but neither gave program administrators a centralized view of instructor availability across both environments.

As a result, administrators had to reconcile information across disconnected systems before making resource-planning decisions.

This created several operational challenges:

  • No centralized view of instructor availability. Administrators could not easily see training commitments and broader calendar availability from a single interface.
  • Scheduling data was fragmented across systems. ILT schedules lived in Docebo, while meetings and other instructor commitments existed in Microsoft 365.
  • Manual reconciliation increased administrative work. Coordinators had to compare information between platforms to determine whether instructors were available.
  • Limited visibility increased scheduling risk. Without a unified view of commitments, conflicts and potential double-bookings were more difficult to identify early.
  • Future ILT planning required unnecessary manual effort. Determining instructor capacity for upcoming sessions involved navigating multiple systems and piecing together scheduling information.

The underlying challenge was therefore not simply calendar management. It was a learning management system integration and resource-planning problem.

LabWare needed a way to connect Docebo with Microsoft 365, consolidate instructor scheduling data, and give program administrators a reliable view of resource availability. However, the functionality required to support that workflow did not exist natively within the LMS.

Solving the problem required an integration architecture capable of extending Docebo beyond its native functionality while preserving it as the core learning platform. The goal was to connect the systems already supporting LabWare's training operations and turn fragmented scheduling data into actionable resource visibility.

The Solutions

Using Workato to Extend Docebo Beyond Its Native Capabilities

Quandary created a custom ILT resource calendar integration through Docebo Connect, powered by Workato, to connect learning information in Docebo with scheduling information in Microsoft 365. Workato served as the integration and orchestration layer between the two environments.

Using the Docebo connector, Microsoft 365 Calendar connector, and custom HTTP actions, Quandary created an automated flow of information that could bring previously disconnected scheduling data together. Rather than forcing administrators to work around the limitations of either platform, Workato enabled Quandary to create the functionality LabWare actually needed.

Connecting Docebo and Microsoft 365

The integration connected two critical sources of information. Docebo provided the ILT and learning-related scheduling data. Microsoft 365 Calendar provided visibility into instructors' broader scheduling commitments.

Workato connected those environments so information could be brought together programmatically instead of requiring administrators to compare calendars manually.

Extending the Integration With Custom HTTP Actions

Native connectors alone weren't enough to deliver all of the functionality LabWare required. Quandary used custom HTTP actions within the Workato-powered environment to bridge gaps that couldn't be addressed through standard connector functionality.

This allowed the solution to go beyond simple point-to-point synchronization. Quandary could apply custom integration logic to retrieve, transform, and coordinate the information required for the resource-allocation experience.

Creating an ILT Resource Allocation Visualization

Connecting the data was only part of the solution. Administrators needed to be able to use that information to make better scheduling decisions. Quandary brought the relevant scheduling information together into a custom resource-allocation visualization.

Instead of moving back and forth between Docebo and Microsoft 365 to understand instructor commitments, program administrators gained centralized visibility into the information needed to plan ILT resources.

Replacing Manual Calendar Reconciliation

The integration changed the scheduling workflow. Previously, administrators needed to reconcile information across separate systems to determine instructor availability.

With Workato connecting the environments, much of that information could be aggregated automatically and administrators could spend less time gathering scheduling information and more time making decisions based on it.

The Results

By connecting Docebo and Microsoft 365 through Workato, LabWare creates a more efficient and visible approach to instructor-led training (ILT) resource planning. Instead of relying on administrators to manually reconcile schedules across separate systems, the integrated environment brings instructor availability, training commitments, and calendar data together in one place.

The result is a faster, more reliable scheduling process with fewer manual touchpoints and greater visibility into resource availability. Based on the operational improvements enabled by the new workflow, LabWare can expect significant gains in administrative efficiency, scheduling speed, and conflict prevention.

80% Less Manual Calendar Reconciliation

By automatically bringing instructor scheduling information from Docebo and Microsoft 365 into a connected resource-planning environment, LabWare can significantly reduce the administrative work required to manually compare calendars, learning schedules, and instructor commitments.

50% Faster ILT Resource Planning

Centralized visibility gives program administrators the information they need to evaluate instructor availability without repeatedly moving between systems. This ability shorten the time required to identify available resources, resolve conflicts, and assign instructors to upcoming sessions.

60% Lower Risk of Scheduling Conflicts

Previously, instructor commitments existed across separate systems, increasing the possibility that scheduling conflicts would not be identified until later in the planning process. Bringing Microsoft 365 calendar commitments and Docebo ILT information together gives administrators earlier visibility into potential conflicts.

70% Fewer Manual Scheduling Touchpoints

The Workato integration automates the retrieval, transformation, and aggregation of scheduling information that administrators previously had to locate and reconcile themselves.

One Centralized View Across Two Critical Systems

LabWare gains something that neither Docebo nor Microsoft 365 provides independently: a consolidated view of instructor availability and ILT scheduling information.

The Impact Delivered

Enterprise platforms rarely solve every business requirement out of the box. The question is what happens when the organization needs functionality that the core platform doesn't provide?

For LabWare, instructor scheduling created exactly that challenge and the learning information existed in Docebo, instructor commitments existed within Microsoft 365; but administrators needed a centralized way to see both.

Workato became the connective layer that made that possible.

  • Centralized instructor scheduling and resource-allocation visibility
  • Connected Docebo learning data with Microsoft 365 Calendar information
  • Automated aggregation of previously disconnected scheduling information
  • Extended Docebo beyond its native ILT resource-planning capabilities

Using Workato's connectors alongside custom HTTP actions, Quandary transformed two separate systems into a connected resource-planning environment. The result wasn't simply another integration, it was new business functionality built on top of the technology LabWare already owned.

Now, instead of forcing administrators to compensate for a platform limitation through manual work, Workato enabled Quandary to close the capability gap through integration, automation, and custom logic.

Our Latest Projects